We just completed converting all of our fire panels from another service to EM 24 and added new communicators. I could not be more pleased with the results. The professionalism your people showed in completing this monumental task (my opinion) went above and beyond. There were obstacles presented by the panels. But, the talent of your crew shined when every obstacle was overcome with positive results. Since the conversions…we have completed our 2018 Annual Sprinkler System / Fire Alarm Panel Inspections. “FLAWLESS” I relayed this information back to our Prologis Senior Property Manager and told her; “this is the fastest these inspections have ever been completed in my 25 years with Prologis.” Again, I wanted to pass on this Thank You and tell you how much I appreciate the TEAM at Kraft Electric!
Commercial
Office – Retail – Warehouse – Distribution – Site Infrastructure
- Aero Commerce Center
- Aero Fulfillment
- Alliance Data
- Aloft Hotel
- Amazon
- Anthem
- Ashville Pike 1
- Atos
- Atricure
- Beckman Coulter
- Belterra Casino Remodel
- Bon-Ton Fulfillment Center
- Bryan Equipment Sales
- Centre Pointe 5 & 6
- CET Station & Transmitter Generators
- CFC
- Cincinnati Police District 3
- Cincinnati Financial
- Columbia Acura
- Contemporary Arts Center
- Corridor Park 75
- Design Within Reach
- DHL
- Doscher’s Candy
- Dr. Pepper Snapple Group
- Dry Ridge Toyota
- Etna #4
- Fairfield Inn
- Fireball
- Gateway/Marx
- General Mills Sales, Inc.
- General Motors SPO
- Giti Tire
- Goodyear Tire Distribution
- Home Depot
- Hotel Covington
- Imflux
- Jeff Wyler Body Shop
- Jeff Wyler Cadillac
- Jeff Wyler Corporate Office
- Jeff Wyler Eastgate
- Jeff Wyler Kia
- Jeff Wyler Mazda
- Jeff Wyler Nissan
- Joseph Cadillac
- Kenwood Towne Place
- Kutol
- Landings 3 Shell and Site
- Levi’s
- Madtree Brewery
- Mars Petcare
- McLane Foodservice
- Microsoft Corporation
- Nehemiah Manufacturing
- Northpoint Groveport 2
- Northpoint WCTC 3 & 4
- Oakley Station
- Octal
- Paycor
- Perfetti
- Pizzuti 5th Floor
- Pizzuti Rick West 1
- Project Eagle
- Project Fireball
- Prologis Etna #5
- Prologis Gateway International
- Prologis Park 70 – Etna
- Red Bank Village
- Resurgent Financial
- RGLP Rail Campus 674
- Rickenbacker West Building 2 & 3
- Sandvick
- Sanmar Corporation
- Scholastic Books
- Summit Hotel
- Target Sugar Creek
- Target World
- Tempur-Pedic
- Ticona Plastics Division
- TSS Aviation
- UHG Call Center
- U Square Office Building/Retail Space
- U Square Garages
- Union Centre #2
- Union Centre #7
- Xebec Rickenbacker
Industrial
- ABB Optical
- Akers Packaging Addition
- Allegion Steelcraft
- Cincinnati Test Systems
- Coke Bottling Distribution Center
- Europstampa
- GE Additive
- GE OWS
- Harmon
- HK Systems
- Kadant Black (Sundance)
- Lewisburg Manufacturing
- Octal
- Peter Cremer North America
- Standard Aero
- Ticona Plastics
- UPS/Zulily
Healthcare
- Anderson Medical Office Building
- Bethesda Butler ER & Imaging
- Christ Hospital Outpatient Center
- Good Samaritan Medical Center
- Healthsource Eastgate
- Healthsource New Richmond
- Medpace
- Mercy Health Headquarters
- Reliant Hospital
- The Christ Hospital
- Tri-Health Physicians
- Tri-Health, Inc. West Chester
- UC Behavioral Health
- Vernon Manor/Children’s Hospital Remodel
- Wellington Orthopedics
- Wellpointe
- Western Ridge Medical Buildings 1 & 2
- Winmed Health Services
- Wright State Physicians
Multi-Family Housing
Testimonials
Not only did we receive a quick response from you, the situation was handled with the utmost professionalism and expertise and it was resolved in a timely manner.
Your crew came in with military efficiency, devised a plan of action, and immediately got to work. Thank you for your willingness to take on such a risky project from your end in order to get UPS out of an extremely tough situation. I look forward to having the opportunity to work with you and your crew again on future projects.
On behalf of the entire team at Steelcraft, and Allegion, we wanted to take the opportunity to thank Kraft Electric for the work that was performed at our facility at the end of 2014. Shutting down production for 2 weeks in order to perform the bus and switch gear replacement was a difficult decision for a plant of 600+ people and growing revenue. Kraft did an excellent job of planning, coordinating, and communicating up front to ensure project plans were in place. The pre-work that was done during the first 3 weeks of December while we were in production was seamless. During the actual shutdown, the level of energy, professionalism, safety, and work ethic displayed by 20+ Kraft associates in the facility should make you very proud. By far, the most rewarding part for our business was seeing Kraft hit their deadline exactly, and restore power to the entire plant on time. The livelihood of 600 associates, and our customers, depended on that. We thank all the Kraft employees involved in this project, and know that we will reach out to them again when the time comes.
“Talk about exceeding expectations! When Easterseals Redwood doubled the size of its campus and converted a former swim and gym building to office space, we knew it was a big job: connecting two old buildings and a new addition, installing significant accessibility upgrades for the individuals we serve, enhancing technology to help our team be more efficient– and getting it all done around us since we weren’t closing or relocating operations.
From creative solutions during the supply chain crisis to the unexpected warmth and respect your team gave our employees and clients, Kraft Electric was a true partner. You did more than electrical work: thank you for helping us create a space that advances our mission for people with disabilities, veterans, and people who are economically disadvantaged.”
Thank you to the Kraft Team on the Fischer Homes Office TI project we recently completed in Erlanger. We were fortunate to have a great team of contractors, and Kraft was at the top of the list. Ron Karaus from Kraft Electric was outstanding on this project. I believe that the “boots on the ground” are the guys that make fast schedules happen, and that was certainly the case with Ron. Week after week, Ron worked through the issues that come with renovation work, and met or exceeded every schedule target we asked him to. Thanks again to Kraft Electric for an outstanding project, and certainly feel free to use my name as a reference for Kraft.
I just wanted to send you a note of thanks and praise for your team’s work on CVG3 Decommissioning project. In this fast paced business, we sometimes forget to recognize success and say job well done!
The work done by Kraft Electrical Contracting, Inc. was excellent. Qualities that stood out were safe work performance, quality workmanship and site coordination. You and your team were great to work with. We hope to do more successful work together in the future.
All of the electricians showed up on time and eager to work. Kraft Electric finished the project ahead of schedule, even with its three revisions changing the electrical scope. I would highly recommend Kraft to perform any electrical work.
I will back him up on this and say that we are above pleased with how all of the conversions went and are very excited to have EM24 handling our monitoring going forward. Thank you for always being there when we need you, Kraft Electric has been a very valuable vendor for us and we greatly enjoy working with your teams.
We want to thank you once again for your efforts on our CA Gateway project.
The Paul Hemmer Company is celebrating our 99th year. We have been successful by focusing on Customer Satisfaction. This is defined by providing value, quality and on-time delivery. Safety can never be compromised. Kraft Electric’s Team stood out in this respect.
Expressing gratitude is not often communicated in the construction industry. Thank you for helping us succeed.